Brisbane is hard on exterior paint. The UV index sits in the extreme range for much of summer, which chalks and dries out the top coat, and a wet February can leave weatherboards damp for weeks.
How long a repaint lasts depends mostly on prep and product choice. Both should be written into the quote before you agree to a start date.
Know what your house is made of
Paddington and Red Hill are full of timber Queenslanders. Further out, suburbs like Stafford and Inala have plenty of 1950s cottages and fibro homes.
Either type needs more prep than brick veneer, and a decent quote will show that prep in writing.
If your Queenslander was built before 1970, assume the older paint layers contain lead until a test says otherwise.
Australian Standard AS/NZS 4361.2 sets out how to manage lead paint in homes, and under it painters shouldn’t dry sand or burn it off, since both release lead dust or fumes. Wet scraping over sealed drop sheets is the usual method.
A good painter will tell you how they plan to test for lead and how they’ll keep the dust out of your garden and off the neighbours’ washing. On a 1920s house, a quote that just says “sand and prep” has left that out.
Post-war cottages bring a different problem.
Fibro cladding and eaves are common, and Queensland homes built before 1990 may contain asbestos, which a painter shouldn’t water-blast or sand.
The Queensland Government’s asbestos site explains what’s allowed when you repaint asbestos sheeting.
Then there’s rot. Window sills and the lowest weatherboards tend to reveal soft timber once scraping starts, and a quote with a set rate for replacement boards means nobody has to negotiate that price halfway through the job.
Check the licence and warranty before you compare prices
In Queensland, painting work valued over $3,300, including labour and materials, needs a licence from the QBCC. The licence number should be printed on the written quote.
Brisbane house painters such as DC Decorators publish their QBCC licence number on their website, so you can check it on the QBCC online register before anyone sets up a ladder.
Do the same for every painter you’re considering. The register shows whether a licence is current and what class of work it covers.
If it has lapsed, there’s no point reading the rest of that quote.
Warranties are a separate matter. Get the length and the coverage in writing.
Workmanship warranties usually cover peeling or flaking caused by poor prep or application, but they rarely cover timber movement, or any area you told the painter to leave alone.
Paint manufacturers’ warranties sit apart from the painter’s and generally depend on the product being applied the way its data sheet says. And a ten-year warranty from a business that closes in year two is worth nothing to you, so it’s fair to ask how long the painter has been operating.
Read the quote line by line
Two quotes for the same house can be thousands of dollars apart, and the gap is usually in what one of them leaves out.
Surfaces come first. On a Queenslander, that means walls, eaves, verandah rails, battens, stumps and lattice, all listed.
Gutters and downpipes get missed a lot; if they aren’t on the quote, they aren’t in the price.
“Two coats of acrylic” tells you very little. You want the product name and the coat count so you can pull up the data sheet yourself.
Anything scraped back to bare timber also needs a primer or sealer before the topcoats, and that should be written in too.
If colour advice is included, find out what it involves.
Flicking through a fan deck at the kitchen table is a long way from a sample patch painted on your own west wall.
West-facing boards in Brisbane cop the full afternoon sun.
Dark colours absorb more heat, which makes timber move and can blister the paint, so if you’ve picked charcoal, the painter should raise it with you before you sign.
Some exterior paints, such as Dulux’s InfraCOOL range, are made to reflect more heat in darker shades.
Last, the deposit. Queensland caps deposits on domestic building contracts at 10% for contracts under $20,000 and 5% for $20,000 and over, and QBCC’s contract guidance explains when those rules apply.
A painter asking for half upfront should be able to explain why.
Book around the weather
Brisbane’s wet season runs roughly from December to March. A 3pm storm can wash paint off boards that were dry and sunny at breakfast, before the coat has had time to cure.
Every paint data sheet lists a minimum surface temperature and a maximum humidity for application. Dew is the other problem.
A careful painter waits for the boards to dry before the first coat, even if that means starting at ten instead of seven.
On a fixed-price job, the quote should say whether rain delays move only the finish date or the price as well.
Interior work depends less on the weather, though humid weeks slow drying between coats.
Find out how many days per room the painter has allowed, or you may be living with tacky doors for a week.
Autumn and spring are usually the easiest seasons for exterior work here, and the better painters book those months out early. Getting quotes a season ahead leaves time for the checks above.
Check the register before the quotes arrive
Look up every painter on your shortlist on the QBCC register tonight and write down each licence number and class.
When the quotes come in, match those numbers against what’s printed on each one, then read the ones that match line by line.

